{"decision":"Approved","last_date_consultation_comments":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.303549,51.460422],[-0.30355,51.460395],[-0.303593,51.460395],[-0.303592,51.460422],[-0.303549,51.460422]]]},"date_building_work_started_under_previous_permission":null,"ward":null,"site_number":"3","polygon":null,"appeal_status":null,"application_type_full":"Approval of details reserved by a condition (discharge)","borough":"Richmond","lpa_name":"Richmond","postcode":"TW9 1SN","appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"28/01/2026","site_name":null,"decision_date":"09/03/2026","pp_id":"PP-14657404","actual_completion_date":null,"url_planning_app":null,"application_details":{"lead_developer_company_name":"21D Urban D"},"development_type":null,"centroid_easting":517952,"decision_target_date":"25/03/2026","decision_agency":null,"actual_commencement_date":null,"lpa_app_no":"PA26/0277","decision_process":null,"lapsed_date":"08/03/2029","uprn":"10002266625","bo_system":"Agile APAS","cil_liability":null,"street_name":"Church Walk","locality":null,"application_type":"All Other","epc_number":null,"decision_conditions":["The applicant is informed that for the avoidance of doubt the details approved by this notice are as follows:-\r\nHelical Bars Materials Report received by the Local Planning Authority on 27 Jan 2026\r\nMethod Statement and Listed Building Consent Supporting Statement - Replacement of Doors and Windows Report received by the Local Planning Authority on 27 Jan 2026\r\nBuilding Conservation and Repair Methodology Clay Tile Roof/Sun Pipe Report received by the Local Planning Authority on 27 Jan 2026\r\nPeriscope Air Brick Materials Report received by the Local Planning Authority on 27 Jan 2026\r\nBrick Materials Report received by the Local Planning Authority on 27 Jan 2026\r\nClay Roof Tiles Report  received by the Local Planning Authority on 27 Jan 2026\r\nHelical Bars Materials Report received by the Local Planning Authority on 27 Jan 2026\r\nBuilding Conservation and Repair Methodology - Creation of Arched Wall Opening Report received by the Local Planning Authority 27 Jan 2026\r\nBuilding Conservation and Repair Methodology Brick Walls REV B Report received by the Local Planning Authority on 06 Mar 2026\r\nBuilding Conservation and Repair Methodology - Lime Mortar, Render and Plaster Repairs Report received by the Local Planning Authority on 27 Jan 2026\r\nExisting Elevation and Sections A and Section B Elevations - Kitchen Window (Side of Door) W1 Ex100 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Section A and Section B Elevations Patio Doors: D2 PR101 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Section A and Section B Elevations Kitchen Window (Side of Door): W1 PR100 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nExisting Section A and Section B Elevations Kitchen Window: W2 Ex102 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Section A and Section B Elevations Kitchen Window:W2 PR102 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nExisting Section A and Section B Elevations First Floor Bathroom Window: W3 Ex104 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Section A and Section B Elevations First Floor Bathroom Window: W3 PR104 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nExisting Section A and Section B Elevations Kitchen Door: D1 Ex103 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Section A Elevations and Section B Kitchen Door: D1 PR103 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nExisting Section A and Section B Elevations Patio Doors: D2 Ex101 Submitted Drawing received by the Local Planning Authority on 28 Jan 2026\r\nProposed Front/South West Elevation 110-D Submitted Drawing received by the Local Planning Authority on 27 Jan 2026\r\nSection AA - Head and Base of Proposed Opening 121 Submitted Drawing received by the Local Planning Authority on 27 Jan 2026"],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":174857,"last_updated":"2026-03-10T00:01:55.909Z","centroid":{"lon":-0.303571,"lat":51.460408},"subdivision_of_building":null,"last_synced":"2026-03-10T01:56:41.148Z","last_updated_by":"Agile APAS","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Richmond-PA26_0277","parking_details":{},"description":"Details pursuant to conditions C3 - Helical bars; C4 - Doors and windows; C6 - Sun pipe; C8 - Materials - a) Clay roof tiles to the main roof and roof of the rear kitchen; b) Air bricks; d) Any replacement bricks required following taking down of top brick courses of front elevation.\r\nC9 - Opening; C10 - Brickwork; C14 - Lime of planning reference PA25/2829/LBC."}