{"date_building_work_completed_under_previous_permission":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.297108,51.451704],[-0.297109,51.451677],[-0.297152,51.451678],[-0.297151,51.451705],[-0.297108,51.451704]]]},"postcode":null,"ward":null,"appeal_start_date":null,"appeal_decision":null,"valid_date":"15/06/2026","secondary_street_name":null,"centroid_northing":173898,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-09-30T00:01:40.971Z","description":"Removal and replacement of 3no antennas, internal upgrade of existing equipment cabin and associated ancillary works","subdivision_of_building":"roof top","epc_number":null,"url_planning_app":null,"borough":"Richmond","street_name":"Richmond Hill","decision_process":null,"last_synced":"2026-10-03T01:45:15.801Z","last_updated_by":"Agile APAS","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"29/09/2029","last_date_consultation_comments":"17/07/2026","title_number":null,"appeal_status":null,"application_type_full":"Full planning & listed building consent","development_type":null,"decision_target_date":"10/08/2026","lpa_name":"Richmond","uprn":"10024344806","decision_date":"29/09/2026","lpa_app_no":"PA26/1938","centroid_easting":518422,"appeal_decision_date":null,"decision_conditions":["For the avoidance of doubt the Drawing(s) No(s) and Document(s) to which this decision refers are as follows:-\r\n\r\nDesign Scheme Photomontages\r\nReceived 07 September 2026\r\n\r\nFire Statement for Telecomunications Development\r\n600 Setting Out Plan \r\n601 AIRI Cabinet Details \r\n602 Vertiv Cabinet Details\r\n603 Bob Ladder Details\r\n604 Sector A Steelwork Details (1 of 5)\r\n605 Sector A Steelwork Details (2 of 5)\r\n606 Sector A Steelwork Details (3 of 5)\r\n607 Sector A Steelwork Details (4 of 5)\r\n608 Sector A Steelwork Details (5 of 5)\r\n609 Antenna Steelwork Support Pole Details Sector B \r\n610 Atenna Steelwork Support Pole Details Sector C (1 of 2)\r\n611 Antenna Steelwork Support Pole Details Sector C (2 of 2)\r\n612 Antenna Steelwork Support Pole Details (1 of 2)\r\n613 Antenna Steelwork Support Pole Details (2 of 2)\r\n614 Antenna Steelwork Support Pole Details - Glideloc \r\n615 Detailed Design - MAFI 3268 Offset Bracker\r\n616 Proposed Mafi 4120 Detail\r\n617 Ers Fixing Detail\r\n618 GPS Node Mounting Detail\r\n619 Cable Tray Details\r\n620 Self Closing Gate Detail\r\n900 General Notes\r\n901 Electrical Notes\r\nReceived 15 June 2026\r\n\r\n002 Site Location Plan\r\n100 Existing Site Plan\r\n150 Proposed Site Plan\r\n200 Existing Site Elevation\r\n250 Proposed Site Elevation\r\nReceived 04 June 2026\r\n\r\nPlanning, Design and Access Statement\r\nDeclaration of Conformity with International Commission on Non-Ionizing Radiation Protection Public Exposure Guidelines\r\nReceived 03 June 2026"],"site_number":"146 158","bo_system":"Agile APAS","status":"Closed","site_name":"RICHMOND HILL HOTEL","decision":"Closed","polygon":null,"centroid":{"lon":-0.29713,"lat":51.451691},"actual_completion_date":null,"pp_id":"PP-14983436","decision_agency":null,"parking_details":{},"locality":"Richmond","id":"Richmond-PA26_1938","application_details":{"lead_developer_company_name":"21D Urban D","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"12/2026","intended_commencement_date":"09/2026"}],"total_gia_gained":0,"site_area":0.1,"total_gia_existing":2000,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":2000,"use_class":"C1","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"scheme_phasing":true,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":2000,"total_gia_lost":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":true,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"}}