{"polygon":null,"site_number":"66","appeal_decision_date":null,"ward":null,"appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Richmond","title_number":null,"valid_date":"12/08/2026","status":"Closed","decision_process":null,"secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-09-26T00:00:43.627Z","decision_target_date":"07/10/2026","street_name":"Mount Ararat Road","postcode":"TW10 6PJ","site_name":null,"lpa_app_no":"PA26/2153","development_type":null,"locality":null,"application_type_full":"Full planning permission","wgs84_polygon":{"coordinates":[[[-0.297543,51.458185],[-0.297544,51.458158],[-0.297587,51.458159],[-0.297586,51.458186],[-0.297543,51.458185]]],"type":"Polygon"},"bo_system":"Agile APAS","url_planning_app":null,"actual_completion_date":null,"application_type":"All Other","decision":"Closed","decision_date":"25/09/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":518375,"lpa_name":"Richmond","decision_agency":null,"last_updated_by":"Agile APAS","last_synced":"2026-09-26T02:09:58.505Z","lapsed_date":"25/09/2029","description":"Refurbishment and extension of existing lower ground and ground floor residential apartment, including demolition of existing rear extension, construction of part single-storey and part two-storey rear extension, external alterations, alterations to the front garden including new boundary treatment, railings, cycle and refuse storage and landscaping works, and associated internal reconfiguration.","last_date_consultation_comments":"11/09/2026","application_details":{"lead_developer_company_name":"21D Urban D","infrastructure_details":{"ghg_reduction_over_building_regulations":false,"no_homes_passive_cooling":1,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":80},"total_gia_existing":119.5,"grey_water_reuse":false,"green_suds":false,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":119.5,"gia_gained":45,"use_class":"C3","gia_lost":0}],"total_gia_gained":45,"site_area":0.0351,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"Whole Phase Works","intended_completion_date":"06/2027","intended_commencement_date":"08/2026"}],"scheme_phasing":true,"total_gia_lost":0,"garden_land_lost":false,"internal_resi_water_usage":105,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":45,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":119.5}},"pp_id":"PP-14954135","actual_commencement_date":null,"uprn":"100023394328","centroid_northing":174618,"subdivision_of_building":"Lower two floors only, not the entire building, which is a four-storey property.","centroid":{"lat":51.458172,"lon":-0.297565},"parking_details":{},"id":"Richmond-PA26_2153","cil_liability":null,"decision_conditions":["For the avoidance of doubt the Drawing(s) No(s) and Document(s) to which this decision refers are as follows:-\r\n\r\n066-T10-90-P1, 066-T20-90-P1 rev C, 066-T10-E04, 066-T20-E04, prepared by CDJM Architects - Submitted 12 August 2026, and\r\n066-T10-E01, 066-T20-E01, 066-T20-E03, 066-T10-E02, 066-T20-E02, 066-T10-P00, 066-T20-P00,  066-T10-P1, 066-T20-P1, 066-T20-BP, prepared by CDJM Architects - Submitted 18 June 2026.\r\nArboricultural Method Statement, Arboricultural Report and Arboricultural Impact Statement, Tree Constrains Plan and Tree Protection Plan (TPP-01 Rev A) - Prepared by Arbor Cultural Ltd -  Submitted 18 June 2026."]}