{"borough":"London Borough of Southwark","application_type":"All Other","decision":"Approved","decision_conditions":["Materials to be as specified","Standard 3 year time limit ","OR46B - Obscure Glazing"],"last_synced":"2026-01-17T02:57:40.407Z","centroid_northing":"175737","url_planning_app":null,"lpa_app_no":"25/AP/3038","site_number":"46A","ward":"CHHI","locality":null,"last_date_consultation_comments":null,"date_building_work_started_under_previous_permission":null,"description":"Proposed single-storey side and rear wraparound extension with new side-facing windows at ground-floor and first-floor.","parking_details":null,"postcode":"SE5 8DL","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14395597","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"geometries":[{"coordinates":[[[533458,175720],[533470,175733],[533475,175739],[533477,175741],[533473,175744],[533471,175742],[533462,175731],[533455,175724],[533458,175720]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.080177,51.464724],[-0.079999,51.464838],[-0.079925,51.46489],[-0.079896,51.464908],[-0.079952,51.464936],[-0.079982,51.464918],[-0.080115,51.464822],[-0.080219,51.46476],[-0.080177,51.464724]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"05/12/2028","bo_system":"Idox Uniform","decision_date":"05/12/2025","centroid_easting":"533471","actual_commencement_date":null,"id":"Southwark-25_AP_3038","lpa_name":"Southwark","decision_target_date":"23/12/2025","valid_date":"29/10/2025","development_type":null,"last_updated":"2026-01-17T01:02:48.157+00:00","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.464873,"lon":-0.079983},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":null,"street_name":"Bromar Road","appeal_decision":null,"title_number":[],"site_name":"","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":28,"non_residential_details":{"total_gia_existing":67.2,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":28},"garden_land_lost":true,"existing_proposed_floorspace_details":[{"gia_existing":67.2,"use_class":"C3","gia_gained":28,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":67.2,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.018500000000000003,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Single phase development","intended_commencement_date":"11/2025","intended_completion_date":"02/2026"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":true,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"200003468291","actual_completion_date":null}