{"borough":"London Borough of Southwark","application_type":"All Other","decision":"Approved","decision_conditions":["Materials to be as specified","Standard 3 year time limit ","Plant Noise ' standard"],"last_synced":"2026-03-13T02:33:51.543Z","centroid_northing":null,"url_planning_app":null,"lpa_app_no":"25/AP/3139","site_number":null,"ward":"BOBA","locality":null,"last_date_consultation_comments":"09/12/2025","date_building_work_started_under_previous_permission":null,"description":"Installation of two air conditioning condenser units on the rear elevation of the property","parking_details":null,"postcode":null,"appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14446728","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[532534,180249],[532534,180249],[532537,180251],[532546,180256],[532543,180261],[532542,180261],[532532,180259],[532531,180259],[532534,180249]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.091772,51.50564],[-0.091772,51.50564],[-0.091728,51.505658],[-0.091597,51.505701],[-0.091638,51.505746],[-0.091652,51.505746],[-0.091797,51.505731],[-0.091812,51.505731],[-0.091772,51.50564]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"30/01/2029","bo_system":"Idox Uniform","decision_date":"30/01/2026","centroid_easting":null,"actual_commencement_date":null,"id":"Southwark-25_AP_3139","lpa_name":"Southwark","decision_target_date":"06/01/2026","valid_date":"12/11/2025","development_type":null,"last_updated":"2026-03-12T21:01:36.467Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":49.766807,"lon":-7.55716},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":null,"street_name":null,"appeal_decision":null,"title_number":[],"site_name":"Ground Floor\r13 Stoney Street\rLondon\rSouthwark\rSE1 9AD\r","appeal_start_date":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"09/2026","intended_commencement_date":"12/2025"}],"total_gia_gained":0,"site_area":0.1,"total_gia_existing":100,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":100,"use_class":"EB","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":100,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"epc_number":null,"uprn":"200003496076","actual_completion_date":null}