{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Southwark","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"08/04/2029","appeal_decision_date":null,"last_updated_by":"Idox Uniform","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-06-15T20:01:05.096Z","url_planning_app":null,"street_name":null,"parking_details":null,"ward":"CAGR","bo_system":"Idox Uniform","site_name":"240-252 Camberwell Road\rLondon\rSouthwark\rSE5 0DP\r","site_number":null,"application_details":{"total_gia_existing":1939,"ownership_status":"Private","phasing_details":[{"phase_detail":"All phases","intended_commencement_date":"03/2026","intended_completion_date":"12/2027"}],"garden_land_lost":false,"total_gia_gained":0,"existing_proposed_floorspace_details":[{"gia_existing":1775,"use_class":"EC3","gia_gained":0,"gia_lost":1775},{"gia_existing":164,"use_class":"C3","gia_gained":0,"gia_lost":164}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"total_annual_pm_emissions":0,"no_new_water_connections_required":0,"waste_provision":true,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":0,"percentage_demolition_construction_material_recycling":0,"green_roof_area":0,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":0},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","internal_resi_water_usage":0,"affordable_housing_fast_track":false,"total_gia_lost":1939,"surface_water_discharge_percentage_reduction":0,"site_area":0.7235,"grey_water_reuse":false,"non_residential_details":{"total_gia_existing":1939,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":1939,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0}},"uprn":"200003453254","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":null,"valid_date":"02/03/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":49.766807,"lon":-7.55716},"centroid_easting":null,"application_type_full":"Full planning permission","pp_id":"PP-14742609","lpa_app_no":"26/AP/0594","polygon":{"geometries":[{"coordinates":[[[532466,176982],[532459,177019],[532452,177018],[532435,177011],[532402,176998],[532373,176982],[532366,176995],[532354,176995],[532348,176966],[532349,176957],[532374,176961],[532395,176969],[532466,176982]]],"type":"Polygon"}],"type":"geometrycollection"},"id":"Southwark-26_AP_0594","appeal_status":null,"appeal_start_date":null,"description":"Facade remediation works to improve fire safety","development_type":null,"decision_conditions":["Standard 3 year time limit ","Materials to match existing"],"last_synced":"2026-06-18T12:55:54.199Z","secondary_street_name":null,"title_number":[],"last_date_consultation_comments":"30/03/2026","decision_process":"Delegated","centroid_northing":null,"borough":"London Borough of Southwark","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.093976,51.476298],[-0.094063,51.476632],[-0.094164,51.476624],[-0.094412,51.476565],[-0.094891,51.476456],[-0.095315,51.476319],[-0.09541,51.476438],[-0.095583,51.476441],[-0.09568,51.476181],[-0.095669,51.4761],[-0.095308,51.47613],[-0.095003,51.476197],[-0.093976,51.476298]]],"type":"Polygon"},"decision_agency":null,"decision_target_date":"26/04/2026","status":"Approved","decision_date":"08/04/2026"}