{"decision_target_date":"11/06/2026","last_updated_by":"Idox Uniform","appeal_decision_date":null,"appeal_status":null,"development_type":null,"postcode":"SE1 9GP","title_number":[],"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"12/2027","intended_commencement_date":"04/2027"}],"total_gia_gained":434,"site_area":0.241,"total_gia_lost":77,"total_gia_existing":77,"existing_proposed_floorspace_details":[{"gia_existing":77,"gia_gained":434,"use_class":"SpecifiedOther","gia_lost":77}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":434,"total_gia_lost":77,"total_gia_existing":77},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public"},"decision_date":"05/08/2026","url_planning_app":null,"borough":"London Borough of Southwark","locality":null,"date_building_work_started_under_previous_permission":null,"bo_system":"Idox Uniform","parking_details":null,"site_name":"London Bridge Station","epc_number":null,"pp_id":"PP-14828914","subdivision_of_building":null,"status":"Approved","description":"Provision of new retail unit (Class E), associated cycle store and improvements to existing pedestrian route to include relocation of cycle parking and new lighting.","decision_conditions":["Materials to be as specified","Refuse Storage ","Standard 3 year time limit ","Footway reinstatement","PROVISION OF CYCLE STORAGE"],"site_number":"","last_updated":"2026-09-15T20:01:13.791Z","last_date_consultation_comments":"19/05/2026","valid_date":"17/04/2026","actual_commencement_date":null,"centroid_northing":"180146","appeal_decision":null,"decision_agency":null,"lpa_app_no":"26/AP/1089","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Southwark-26_AP_1089","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[532804,180288],[532786,180297],[532779,180257],[532796,180259],[532825,180257],[532835,180256],[532857,180249],[532874,180242],[532893,180230],[532905,180221],[532917,180210],[532947,180255],[532917,180267],[532884,180277],[532830,180288],[532830,180287],[532804,180288]]],"type":"Polygon"}]},"appeal_start_date":null,"decision_process":"Delegated","ward":"LBWB","street_name":"London Bridge Street","secondary_street_name":null,"last_synced":"2026-09-16T02:21:42.257Z","lpa_name":"Southwark","reference_no_of_permission_being_relied_on":null,"cil_liability":true,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.08787,51.505928],[-0.088125,51.506013],[-0.088241,51.505655],[-0.087996,51.505669],[-0.087579,51.505644],[-0.087435,51.505633],[-0.087121,51.505565],[-0.086879,51.505498],[-0.08661,51.505385],[-0.08644,51.505302],[-0.086272,51.5052],[-0.085823,51.505597],[-0.08625,51.505712],[-0.086722,51.50581],[-0.087495,51.505922],[-0.087496,51.505913],[-0.08787,51.505928]]]},"uprn":"010094086242","application_type":"All Other","centroid":{"lat":51.504618,"lon":-0.085893},"lapsed_date":"05/08/2029","application_type_full":"Full planning permission","centroid_easting":"532945","actual_completion_date":null}