{"date_building_work_completed_under_previous_permission":null,"cil_liability":true,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.04444,51.497127],[-0.043228,51.498177],[-0.043794,51.498438],[-0.045033,51.497407],[-0.044638,51.497229],[-0.04444,51.497127]]]},"postcode":null,"ward":"SUDO","appeal_start_date":null,"appeal_decision":null,"valid_date":"11/06/2026","secondary_street_name":null,"centroid_northing":null,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-11-16T21:01:12.000Z","description":"Details of all reserved matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to hybrid planning permission ref. 18/AP/1604 dated 29th May 2020 (as amended by Section 73 application ref. 25/AP/0242 dated 11th May 2026) relating to Development Plot H2 within Development Zone H, comprising the vertical and horizontal extension and refurbishment of the former Harmsworth Quays Printworks building to provide a cultural use (Use Class D2) with associated car parking, cycle parking, landscaping, public realm, plant and associated works.\r\rThis is an application for subsequent consent accompanied by an environmental statement (18/AP/1604) and Statement of Conformity (25/AP/0242). Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Masterplan ES and Statement of Conformity which can be viewed in full on the Councils website (18/AP/1604 and 25/AP/0242).","subdivision_of_building":null,"epc_number":null,"url_planning_app":null,"borough":"London Borough of Southwark","street_name":null,"decision_process":"Delegated","last_synced":"2026-11-17T02:19:38.698Z","last_updated_by":"Idox Uniform","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"01/09/2029","last_date_consultation_comments":"07/07/2026","title_number":[],"appeal_status":null,"application_type_full":"Approval of reserved matters","development_type":null,"decision_target_date":"10/09/2026","lpa_name":"Southwark","uprn":"010009790820","decision_date":"01/09/2026","lpa_app_no":"26/AP/1655","centroid_easting":null,"appeal_decision_date":null,"decision_conditions":["WIND MITIGATION MEASURES","URBAN GREENING FACTOR","PRINTWORKS WALK DESIGN","VENUE NOISE MANAGEMENT PLAN","POST CONSTRUCTION MONITORING REPORT","OBSCURING OF WINDOWS","TERRACE BARRIERS","NOISE LEVELS","TERRACE USE","OPERATIONAL MANAGEMENT PLAN","FIRE STATEMENT","ACOUSTIC VALIDATION","HOURS OF USE","SERVICING AND DELIVERIES","APPROVED PLANS","EVENT MONITORING","WHOLE LIFE-CYCLE CARBON ASSESSMENT","COMMUNITY USE SCHEME","BREEAM"],"site_number":null,"bo_system":"Idox Uniform","status":"Approved","site_name":"Plot H2, Canada Water Masterplan \rFormer Harmsworth Quays Printworks\rSurrey Quays Road\rLondon\rSE16 7PJ\r\r\r","decision":"Approved","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[535844,179389],[535925,179508],[535885,179536],[535802,179419],[535830,179400],[535844,179389]]],"type":"Polygon"}]},"centroid":{"lon":-7.55716,"lat":49.766807},"actual_completion_date":null,"pp_id":"PP-14771389","decision_agency":null,"parking_details":null,"locality":null,"id":"Southwark-26_AP_1655","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Building H2","intended_commencement_date":"11/2026","intended_completion_date":"09/2028"}],"total_gia_gained":23529,"site_area":0.7709849999999999,"total_gia_lost":0,"total_gia_existing":0,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"SpecifiedOther","gia_gained":23529,"gia_lost":0}],"projected_cost_of_works":"Over £100m","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":6,"max_height":37.7,"building_ref":"Building H2"}],"grey_water_reuse":true,"green_suds":false,"surface_water_discharge_percentage_reduction":50,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":23529,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":851,"urban_greening_factor_score":0.09,"solar_pv_capacity":0.22,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":true,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"chp_heat_pumps_capacity":1.71,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private","lead_developer_company_name":"CW BL Holdings Ltd (British Land)"}}