{"status":"Approved","decision":"Approved","valid_date":"15/09/2026","decision_target_date":"09/11/2026","centroid_northing":null,"development_type":null,"actual_completion_date":null,"decision_conditions":["Materials to be as specified","Standard 3 year time limit ","Landscaping Pre-commencement"],"lpa_name":"Southwark","date_building_work_completed_under_previous_permission":null,"cil_liability":false,"pp_id":"PP-15216025","last_updated":"2026-11-16T21:01:42.657Z","parking_details":null,"lapsed_date":"09/11/2029","title_number":[],"locality":null,"url_planning_app":null,"last_date_consultation_comments":"07/10/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.075096,51.448265],[-0.074972,51.448146],[-0.074899,51.448172],[-0.074719,51.447998],[-0.074719,51.447998],[-0.074333,51.447605],[-0.074098,51.4477],[-0.07447,51.448093],[-0.07447,51.448093],[-0.074525,51.448156],[-0.074174,51.448304],[-0.073881,51.448425],[-0.073881,51.448416],[-0.073837,51.448442],[-0.073878,51.448497],[-0.073892,51.448497],[-0.074098,51.448743],[-0.074859,51.448423],[-0.07492,51.448352],[-0.074964,51.448334],[-0.07495,51.448316],[-0.075096,51.448265]]]},"application_type_full":"Full planning permission","ward":"DUVI","bo_system":"Idox Uniform","last_synced":"2026-11-17T02:20:08.723Z","appeal_decision_date":null,"decision_date":"09/11/2026","centroid":{"lat":49.766807,"lon":-7.55716},"lpa_app_no":"26/AP/2684","actual_commencement_date":null,"site_name":"Church Of St Thomas More \r380 Lordship Lane\rLondon\rSouthwark\rSE22 8ND","secondary_street_name":null,"id":"Southwark-26_AP_2684","uprn":"200003443628","centroid_easting":null,"decision_agency":null,"decision_process":"Delegated","street_name":null,"subdivision_of_building":null,"epc_number":null,"site_number":null,"reference_no_of_permission_being_relied_on":null,"polygon":{"geometries":[{"coordinates":[[[533859,173899],[533868,173886],[533873,173889],[533886,173870],[533886,173870],[533914,173827],[533930,173838],[533903,173881],[533903,173881],[533899,173888],[533923,173905],[533943,173919],[533943,173918],[533946,173921],[533943,173927],[533942,173927],[533927,173954],[533875,173917],[533871,173909],[533868,173907],[533869,173905],[533859,173899]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Idox Uniform","appeal_start_date":null,"borough":"London Borough of Southwark","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"03/2027","intended_completion_date":"04/2027"}],"total_gia_gained":0,"site_area":0.1,"total_gia_lost":0,"total_gia_existing":0,"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":0,"green_suds":false,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"description":"Landscaping works to provide accessible access from the church carpark to the John Paul Community Hall and Parish Office.","appeal_status":null,"postcode":null,"application_type":"All Other"}