{"decision_date":"29/07/2026","appeal_decision_date":"29/07/2026","last_synced":"2026-10-28T03:29:16.221Z","title_number":null,"borough":"Tower Hamlets","last_updated":"2026-10-27T21:01:57.473Z","centroid_northing":182023.0,"url_planning_app":"https://development.towerhamlets.gov.uk/online-applications/applicationDetails.do?keyVal=DCAPR145595&activeTab=summary","actual_completion_date":null,"last_updated_by":"CSV Data Import","decision_target_date":null,"locality":null,"epc_number":null,"site_number":null,"lpa_app_no":"PA/24/01450/A1","last_date_consultation_comments":null,"decision_conditions":null,"status":"Allowed","valid_date":"19/08/2024","application_type":"All Other","appeal_start_date":"27/06/2025","description":"Demolition of existing buildings on site and construction of new building comprising 5,200sqm GIA of Use Class B8 floorspace for use as a data centre, reaching a maximum height of approximately 29m (41.78m AOD).This application is accompanied by an Environmental Impact Assessment (EIA).","cil_liability":true,"uprn":"6162105","decision":"Declined to Determine","decision_agency":null,"pp_id":"PP-13225411","site_name":"Land at the corner of Grey Eagle Street and Calvin Street, E1","id":"Tower_Hamlets-PA_24_01450_A1","postcode":null,"subdivision_of_building":null,"date_building_work_completed_under_previous_permission":null,"centroid_easting":533735.0,"lpa_name":"Tower Hamlets","appeal_decision":"Allowed","actual_commencement_date":null,"secondary_street_name":null,"development_type":"Q06","ward":"Spitalfields and Banglatown","bo_system":"CSV Data Import","street_name":null,"decision_process":null,"appeal_status":null,"polygon":null,"application_type_full":"Full planning permission","wgs84_polygon":null,"application_details":{"scheme_phasing":true,"total_gia_lost":0,"scheme_name":"47 Grey Eagle Street","rain_water_harvesting":false,"projected_cost_of_works":"Between £2m and £100m","site_area":0.16,"surface_water_discharge_percentage_reduction":90,"ownership_status":"Private","internal_resi_water_usage":0,"total_gia_existing":1733,"green_suds":true,"phasing_details":[{"phase_detail":"1","intended_completion_date":"10/2026","intended_commencement_date":"10/2025"}],"grey_water_reuse":false,"infrastructure_details":{"no_new_water_connections_required":1,"total_annual_nox_emissions":0,"mobile_network_operators_consultation":false,"no_homes_to_have_electrical_heating":0,"total_annual_pm_emissions":0,"urban_greening_factor_score":0.37,"no_new_gas_connections_required":0,"green_roof_area":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":0,"fire_suppression_system_proposed":true,"percentage_demolition_construction_material_recycling":20,"waste_provision":true,"solar_pv_capacity":0,"chp_heat_pumps_capacity":0,"ghg_reduction_over_building_regulations":true},"garden_land_lost":false,"existing_uprns":null,"existing_proposed_floorspace_details":[{"gia_existing":1733,"use_class":"B8","gia_gained":5200,"gia_lost":0}],"building_details":[{"no_storeys":4,"max_height":29,"building_ref":"Block A, Data Centre"}],"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":1733,"total_gia_lost":0,"total_non_resi_gross_internal_floor_area_to_be_gained":5200,"total_gia_gained":5200},"affordable_housing_fast_track":false,"total_gia_gained":5200},"reference_no_of_permission_being_relied_on":null,"parking_details":{"net_car":0,"no_existing_car":0,"no_proposed_cycle":17,"net_cycle":17,"no_proposed_car":0,"no_existing_cycle":0},"lapsed_date":"29/07/2029","date_building_work_started_under_previous_permission":null,"centroid":{"lat":51.5213,"lon":-0.073806}}